D.A.E.CO

15 years of experience

 has been established through hard working for more  than 15 years of experience in the Oil Field and more than 20 years  of experience in the Engineering field

Oil Field

Oil Field

15 years of experience in the Oil Field

Engineering field

Engineering field

and more than 20 years  of experience in the Engineering field

image
100 +
Project Completed
image
6 +
Ongoing Project
image
3 +
Iso

DAE OBJACTIVE

quality policy is to achieve sustained, profitable growth by providing services which consistently satisfy the needs and expectations of its customers.
This level of quality is achieved through adoption of a system of procedures that reflect the competence of the Company to existing customers, potential customers, and independent auditing authorities.

What We Do

View D.A.E Solutions Best Services

image

As part of our ongoing support for construction and oil and gas projects, we provide fabrication and laying of pipe lines along with all related services, undertaking all correlating aspects.

image

Being well-equipped with the newest heavy-duty equipment enabled us to handle complete projects and sub-projects in the fields of infrastructure and transportation by utilizing our well-trained staff

image

Our range of contracting services are extensive and are comprised of different activities such as designing, constructing, and operating civil infrastructure projects including , highways, and water and wastewater facilities.

image

we have been committed to providing construction solutions and services for a number of civil engineering projects, as we have adopted the construction works for various projects throughout Iraq

image

Installing towers and wiring by qualified engineer by using the suitable machines instruments we can achieve our aims with the clients by satisfying them with high quality results

image

Supply, installation and operation of the unit combined water capacity of 50 cubic meters / hour to the al Husseiniya processions in the way of Numaniyah and the surrounding villages and was signed with the governor of Waist.

image

This project includes construction of a pipeline to transfer water from the station Al-Malih to CPECC, same amount of oil extracted from the wells to prevent a collapse in the soil of the well.

image

We are in the process of this project fencing the completed wells with (BRC) for the protection it from animals or Infringing on it.. And it be part of the standard specifications with the strength and durability

Let's Talk