Internal transportationDAE company operating within the project inward Al-Waha petroleum
Installing towers and wiring by qualified engineer byusing the suitable machines instruments we can achieveour aims with the clients by satisfying them with highquality results
Supply, installation and operation of the unit combined water capacity of 50 cubic meters / hour to the al Husseiniya processions in the way of Numaniyah and the surrounding...
This project includes construction of a pipeline to transfer water from the station Al-Malih to CPECC,
